In 2025, the Dervallières swimming pool will be open all year round
Info in +
In 2022, work in Petite Amazonia
The swimming pool located in Malakoff-Pré Gauchet and commissioning in 2007, will benefit from sustainable maintenance work.Objective: to allow greater energy and water saving.Concretely, air treatment, the replacement of the solar hot water device with thermal solar panels and thermal insulation under the beaches (deteriorated by infiltration) as well as the installation of LED lighting are provided.This work, scheduled for 10 months from July 2022 to May 2023, will cause the pool closed during the duration of the site.Operation cost: € 2.76 million.
Learn more about Nantes swimming pools and the metropolis: Metropolis.nantes.FR/Pools
How to start a keto diet: 5 essential steps for beginners https: // t.CO/MR8R7AXR8X
— ali alqarni Tue Apr 20 06:43:01 +0000 2021